Skip to main content

B2B Engineering Catalog

Products, Molds & Specialized Spares

Precision manufactured plastic components, multi-cavity injection tooling, and OEM replacement spares. Filter by engineering polymer or equipment brand.

Showing 21 of 21 Items

Bulk RFQ Request
BT-TX-SC01 Tooling Ready
Tol: ±0.05 mm

Textile Machinery Parts

Sewing Thread Cone & Embroidery Cone

Precision molded plastic sewing thread & high-speed embroidery cones with anti-slip micro-grooves.

Material(s):
Virgin Polypropylene (PP), Impact Modified PP, Anti-static Compound
Min Order (MOQ):
5,000 units
Dispatch / Lead:
5-7 Business Days
BT-TX-SB02 Tooling Ready
Tol: ±0.02 mm

Textile Machinery Parts

Simplex Bobbin & Ring Bobbin

High-speed spinning ring bobbins and roving simplex bobbins with reinforced axial ribbing.

Material(s):
Polycarbonate (PC), Impact-Modified Nylon 6, Reinforced PP
Min Order (MOQ):
2,000 units
Dispatch / Lead:
5-8 Business Days
BT-TX-CB03 Tooling Ready
Tol: ±0.04 mm

Textile Machinery Parts

Cheese Bobbin & Shelford Tube

Perforated and parallel cheese tubes and Shelford cylinders for high-pressure package dyeing.

Material(s):
Modified PP Heat-Stabilized, Glass-Filled PP (15%)
Min Order (MOQ):
3,000 units
Dispatch / Lead:
5-9 Business Days
BT-TX-CL04 Tooling Ready
Tol: ±0.03 mm

Textile Machinery Parts

Carrier Locks for Dyeing Department

Corrosion-resistant quick-lock clamps and spindle spacers for high-temperature dyeing vessels.

Material(s):
Stainless Steel 316, Acid-Resistant Modified Polymer, Titanium Fastener
Min Order (MOQ):
100 sets
Dispatch / Lead:
4-7 Business Days
BT-TX-KS05 Tooling Ready
Tol: ±0.01 mm

Textile Machinery Parts

S.S Adopter King Spool Tk2-20

Precision stainless steel adapter king spool assembly for Tk2-20 thread winding equipment.

Material(s):
Stainless Steel 304 / 316, Precision Ground Core
Min Order (MOQ):
50 units
Dispatch / Lead:
4-6 Business Days
BT-AP-YK01 Tooling Ready
Tol: ±0.005 mm

Apparel Machinery Parts

Yoke Knife & Cutting Blade

Industrial hardened alloy steel yoke knife for automated apparel cutting and sewing heads.

Material(s):
SKH-51 High Speed Steel (HSS), Tungsten Carbide Inset, D2 Tool Steel
Min Order (MOQ):
100 units
Dispatch / Lead:
3-6 Business Days
BT-AP-YC02 Tooling Ready
Tol: ±0.008 mm

Apparel Machinery Parts

Yarn Cutter Tk2-20 & Guide Clamp

Precision cutter blade and yarn feeder guide clamp engineered for Tk2-20 thread winders.

Material(s):
HSS Blade Insert, Hard Anodized Aircraft Aluminum Guide, Spring Steel
Min Order (MOQ):
50 units
Dispatch / Lead:
4-7 Business Days
BT-AP-MD03 Tooling Ready
Tol: ±0.01 mm

Apparel Machinery Parts

Magnetic Sense Disk & Industrial Clamp

High-sensitivity magnetic sensor disk and precision position clamp for automated sewing heads.

Material(s):
POM Body, Neodymium NdFeB Magnets, Stainless Steel Central Bushing
Min Order (MOQ):
100 units
Dispatch / Lead:
5-8 Business Days
BT-CNC-BG01 Tooling Ready
Tol: DIN 3962 Class 6-7 / AGMA 10-11 (±0.008 mm)

CNC Machining & Gears

Precision Bronze Gear & Aluminum Gear

CNC hobbed and ground phosphor bronze and aircraft aluminum gears for high-precision drive trains.

Material(s):
Phosphor Bronze (CuSn12 / Ampco), Aircraft Aluminum 7075-T6 / 6061-T6, Mild Steel Hubs
Min Order (MOQ):
25 units
Dispatch / Lead:
5-9 Business Days
BT-CNC-IP02 Tooling Ready
Tol: ±0.01 mm

CNC Machining & Gears

Teeth Wheel Idler Pulley & Support Roller

Timing belt toothed idler pulleys and aluminum support rollers with integrated sealed ball bearings.

Material(s):
Anodized Aluminum 6061-T6, Steel Hub Insert, Sealed Chrome Steel Bearings (608 / 6000 2RS)
Min Order (MOQ):
40 units
Dispatch / Lead:
4-7 Business Days
BT-CNC-SB03 Tooling Ready
Tol: ±0.008 mm (Shaft fit g6/h7)

CNC Machining & Gears

Slider Assembly with Bronze Bush & Roller with Bolt

Heavy-duty mechanical slider blocks with oil-impregnated sintered bronze bushings and cam rollers.

Material(s):
Cast Iron / Mild Steel Body, Sintered Bronze Bushing (Oil-Impregnated), Alloy Steel Roller Pin
Min Order (MOQ):
30 units
Dispatch / Lead:
5-8 Business Days
BT-CNC-CP04 Tooling Ready
Tol: ±0.01 mm

CNC Machining & Gears

Precision Coupling & H-Corner Connector

Flexible zero-backlash shaft couplings and aluminum structural H-corner frame connectors.

Material(s):
High-Strength Aluminum Alloy, Polyurethane Elastomer Spider, Stainless Steel Clamping Screws
Min Order (MOQ):
40 units
Dispatch / Lead:
4-6 Business Days
BT-CNC-GH05 Tooling Ready
Tol: ±0.01 mm

CNC Machining & Gears

Gear Tooth Hub & Connecting Assembly Rod

CNC machined gear hubs and forged connecting assembly rods for mechanical linkage mechanisms.

Material(s):
Chrome-Moly 4140 (42CrMo4), Mild Steel C45, Self-Lubricating Bushing Inserts
Min Order (MOQ):
25 units
Dispatch / Lead:
6-10 Business Days
BT-CNC-AT06 Tooling Ready
Tol: ±0.008 mm

CNC Machining & Gears

Adapter Training TN-35 & Assembly Gears

Industrial adapter TN-35 and complete aluminum assembly gear pairs for textile drive units.

Material(s):
Duralumin 7075-T6, Case-Hardened Carbon Steel, Hard Chrome Surface
Min Order (MOQ):
20 sets
Dispatch / Lead:
5-9 Business Days
BT-MD-PM01
Tol: ±0.005 mm (5 microns)

Plastic Molds & Metal Dies

All Types of Plastic Injection Molds

Complete design and manufacture of high-precision multi-cavity plastic injection molds.

Material(s):
Assab S136 ESR Stainless Tool Steel, Bohler M310, DIN 1.2344 / H13 ESR, P20 Pre-hardened
Min Order (MOQ):
1 Mold Set (Complete Tooling Package)
Dispatch / Lead:
25-35 Calendar Days to T1 Sample
BT-MD-MD02
Tol: ±0.005 mm

Plastic Molds & Metal Dies

Precision Metal Stamping & Forming Dies

Progressive, compound, and deep drawing metal stamping dies for sheet metal components.

Material(s):
D2 / SKD11 Cold Work Steel, High-Speed Steel Punches (HSS/M2), Ampco Wear Plates
Min Order (MOQ):
1 Die Set
Dispatch / Lead:
20-30 Calendar Days
BT-MD-TS03 Tooling Ready
Tol: Coating thickness controlled within ±2 microns (0.002 mm)

Plastic Molds & Metal Dies

Metal Treatment, Micropolish & Anodizing Services

Comprehensive metal surface treatment, mirror micropolishing, hard chrome, and MIL-A-8625 anodizing.

Material(s):
Steel, Stainless Steel, Aluminum Alloys, Brass, Bronze
Min Order (MOQ):
Batch orders or single tooling sets
Dispatch / Lead:
2-5 Business Days